A typical home standby air-cooled generator installation will take about one day to complete. Liquid-cooled models would take longer to complete. If a concrete pad is necessary it would add a day or two for the concrete to dry. The length of time is based on a typical application. It does not apply to applications that require extended runs of wiring or gas piping.